What is WIP costing?

How value accumulates on the shop floor between issuing materials and receiving finished goods — and why the WIP balance so often will not reconcile.

In short

Work in progress is the value sitting on the shop floor: materials issued to a work order, plus labour and overhead absorbed against it, minus the value of anything completed and received into stock. In an ERP the WIP account is a holding balance, and it should empty as orders close. A WIP balance that only grows is usually the clearest signal that something in manufacturing accounting is wrong.

Why It Matters

Why this matters in practice

WIP is where manufacturing costing goes wrong quietly. Every other balance has somebody watching it: stock gets counted, debtors get chased, the bank reconciles. WIP sits between those, often unreviewed, and absorbs the consequences of every under-issue, over-issue and un-closed work order until year-end stock valuation forces the question.

Holds the cost of orders in progress so the P&L is not hit before completion
Reveals the true cost of a job once it closes, against its standard
Carries material, labour and overhead separately, so variances are attributable
Should trend to a predictable level, not climb indefinitely
How It Works

How it works in practice

1

Materials are issued

Components move out of stock and into the work order. The inventory account is credited, WIP debited.

2

Labour and overhead absorb

Shop-floor confirmations against routing operations absorb labour and overhead onto the order at the rates configured.

3

Completions are received

Finished items are received into stock at standard cost. WIP is credited by that amount.

4

The order is closed

Any residue left in WIP after completion is the variance — it is cleared to a variance account, and this is the step most often skipped.

5

The balance is reconciled

Open order value in the sub-ledger should equal the WIP account in the general ledger. If it does not, the difference is a real problem, not a rounding issue.

Worked example

A worked example: a WIP balance that only ever grows

A manufacturer notices its WIP balance has climbed from about 18 lakh to 31 lakh over eighteen months, while production volume is flat. Nobody can explain it, and each month it gets a little worse.

The cause turns out to be ninety-one works orders left technically open — production finished, the goods were delivered, but nobody closed the order. Each one holds a small residual: material issued and not consumed, labour booked after the last completion, overhead absorbed on a final operation. Individually they are a few thousand rupees. Together they are roughly thirteen lakh of cost sitting on the balance sheet that belongs in cost of goods sold.

The fix is procedural rather than technical: a weekly review of orders completed but not closed, with a hard rule that an order cannot stay open more than thirty days past its last completion. The thirteen lakh comes out as a one-off correction, which is uncomfortable, and then WIP tracks production again. The useful lesson is that WIP is a holding account — the only thing it should do over a steady period is stay roughly steady.

Key terms

The vocabulary, briefly

Term What it means
WIP account The balance sheet account holding the value of production that has started but not finished. It should clear as orders complete.
Absorption Applying overhead to production, usually by labour hour or machine hour, so a unit carries a share of indirect cost.
Variance The gap between standard and actual cost. Useful when it is analysed by cause; meaningless when it is written off in one line.
Order close The point at which a works order stops accepting cost and its balance is cleared out of WIP. Orders left open are the main cause of WIP drift.
Backflush Consuming components automatically on completion rather than issuing them individually. Fast, and dangerous when the BOM is inaccurate.
What Goes Wrong

Common mistakes worth avoiding

Work orders never closed

An order left open holds its residual value in WIP forever. A list of orders completed but not closed is the first thing to check when WIP climbs.

Issuing outside the work order

Material taken from stores without being issued to the order understates WIP and overstates the variance later.

Routing times that are fiction

Labour absorbs at the routing's standard time. If the routing says twenty minutes and the job takes an hour, every order absorbs wrongly.

No scheduled reconciliation

WIP should be reconciled monthly. Discovering a year of drift at the annual audit is the expensive version.

What to measure

Numbers worth tracking

Metric What it tells you What distorts it
WIP ageing How long value has been sitting in WIP. Anything past one production cycle deserves a reason. Averaging; a few very old orders disappear into a mean dominated by current ones.
Orders completed but not closed The most direct leading indicator of WIP drift. Nothing, which is why it is the one to watch weekly.
Variance as a share of standard cost Whether standards reflect reality. Persistently large variance means the standard is wrong, not production. Netting favourable against unfavourable, which cancels two real problems into one apparent non-problem.
Overhead absorption rate vs actual Whether you are over- or under-absorbing, and therefore whether unit costs are believable. Volume changes; a rate set at one output level misleads at another.
FAQ

Questions we are asked about this

Almost always un-closed work orders, or material issued to orders that were later abandoned. Pull a list of orders with a completion date but no close, and the bulk of it usually appears there.
No — not unless you finish everything you start within the month. It should be explainable: the sum of value on orders genuinely still in progress, and nothing else.
When it is genuinely committed to a specific order: material at the point of issue, labour as it is booked, overhead as it is absorbed against the operation. The common error is issuing material to WIP in bulk at the start of a week or a batch, which inflates WIP and destroys the link between cost and order. If you cannot say which order a cost belongs to, it should not be in WIP.
Scrap discovered during production should be written off to a scrap account as it happens, with a reason code, not left in WIP to be absorbed by the units that survive. Leaving it in overstates the cost of good units and hides the scrap rate. The reason code is the valuable part — scrap written off without one tells you how much you lost but nothing about why.
Usually a timing difference that has become permanent. The floor reports completions at the end of a shift, the system posts them the next morning, and month-end falls in the gap. That is normal and self-correcting. What is not self-correcting is backflushing against an inaccurate BOM, which creates a consumption error on every single order and compounds silently. If your reconciliation gap grows rather than oscillates, look at the BOM before the timing.
Standard costing with variance analysis for anything repetitive, because it gives you a stable benchmark and makes deviation visible. Actual costing for project or job work where every order genuinely differs and a standard would be fiction. The hybrid that works in practice is standard cost for material and labour with actual overhead applied at period end, which keeps day-to-day numbers stable without letting absorption drift all year.
Related

Where to read next

What is a bill of materials?

Read more

Standard vs actual costing

Read more

What is MRP?

Read more

Need this applied to your own systems?

We build and support the systems this page describes. Start with a free working proof of concept — no cost, no commitment.